EN10305-3 Low Carbon Steel Tube

Steel Grade
Efnasamsetning
Symbol
Material Number
C
Max.
Si
Max.
Mn
Max.
P
Max.
S
Max.
E155
1.0033
0.11
0.35
0.70
0.025
0.025
E195
1.0034
0.15
0.35
0.70
0.025
0.025
E235
1.0308
0.17
0.35
1.20
0.025
0.025
E275
1.0225
0.21
0.35
1.40
0.025
0.025
E355
1.0580
0.22
0.55
1.60
0.025
0.025
Steel Grade
+C
+LC
+SR
Name
No.
Rm
Mpa
A
%
Rm
Mpa
A
%
Rm
Mpa
ReH
Mpa
A
%
E155
1.0033
400
6
350
10
350
245
18
E195
1.0034
420
6
370
10
370
280
18
E235
1.0308
490
6
440
10
440
325
14
E275
1.0225
560
5
510
8
510
375
12
E355
1.0580
640
4
590
6
590
435
10
Steel Grade
+A
+N
Name
No.
Rm
Mpa
A
%
Rm
Mpa
ReH
Mpa
A
%
E155
1.0033
260
28
270–410
155
28
E195
1.0034
290
28
300–440
195
28
E235
1.0308
315
25
340–480
235
25
E275
1.0225
390
21
410–550
275
21
E355
1.0580
450
22
490–630
355
22

  • Lýsing
  • EN10305-3 Low Carbon Steel Tube
  • Baosheng's Advantage
  • Fyrirspurn

Our workshop covers an area of 15000 square meters equipped with the state-of-art facilities to manufacture the welded carbon steel tubes and welded-redrawn carbon steel tubes.

Six modernized high frequency welding lines.

Four modernized cold drawn lines.

Five Automatic chamfering machines

Twenty Automatic cutting machines

Two Automatic packing machines

Mánaðarleg framleiðslugeta er 250,000 meters of welded carbon steel tubes.

Efnin eru :E215,E235,E255,E355 from Baosteel,Ansteel,Posco,o.s.frv, other material can be achieved after discussion.

Mainly sizes:OD from 6.35 to 76.20mm,WT:0.7mm to 3mm.

We have been delivering these tubes to UK,Frakkland,Tyrkland,Germany,Brazil etc for the automotive industry,since 2011.etc.

1. Production of DIN/EN10305-3 welded steel tubes since 2005.

2. Assit tubing requirements to worldwide customers since 2009.

3. Hægt er að afhenda sýni innan 10 dögum eftir staðfestingu

4. 35 daga sem framleiðslutímabil og afhending eftir staðfestingu pöntunar.

5. 20,000 meters of EN10305-3 welded steel tubes in stock.

6. 200 stærðir er hægt að bjóða frá OD:6.35mmxWT:0.7mm til od:76.2mmxWT:3Mm

7. Skoðun þriðja aðila eins og:TUV,BV,SGS,osfrv samþykkt

8. Fagteymi aðstoðar sérstakar kröfur þínar um rör.

9. Aðrar tengdar slöngur eru í boði :En10305-2 welded & redrawn carbon steel tubes,low carbon bundy steel tubes,o.s.frv

1. Production of DIN/EN10305-3 welded steel tubes since 2005.

2. Assit tubing requirements to worldwide customers since 2009.

3. Hægt er að afhenda sýni innan 10 dögum eftir staðfestingu

4. 35 daga sem framleiðslutímabil og afhending eftir staðfestingu pöntunar.

5. 20,000 meters of EN10305-3 welded steel tubes in stock.

6. 200 stærðir er hægt að bjóða frá OD:6.35mmxWT:0.7mm til od:76.2mmxWT:3Mm

7. Skoðun þriðja aðila eins og:TUV,BV,SGS,osfrv samþykkt

8. Fagteymi aðstoðar sérstakar kröfur þínar um rör.

9. Aðrar tengdar slöngur eru í boði :En10305-2 welded & redrawn carbon steel tubes,low carbon bundy steel tubes,o.s.frv

Samband Okkur